Project Description

SAND VOLLEYBALL COMPLEX

PROJECT DESCRIPTION

The Sand Volleyball Complex at the University of Alabama at Birmingham is home to the first official intercollegiate sand volleyball competition. Dynamic Civil Solutions performed engineering and construction administration services for the construction of the Sand Volleyball Complex with integral spectator area. The complex consists of three (3) courts conforming to all Olympic and National Collegiate Athletic Association (NCAA) requirements. Significant emphasis was placed on designing and installing a highly efficient sub-surface drainage system that ensure the courts are playable even immediately after significant rain events.

Engineering services included civil site design, site grading and drainage plan, subsurface drainage system design, underground detention system, erosion and sediment control plans, utility systems design, civil construction details and construction administration.

OWNER

The University of Alabama at Birmingham

PROJECT SIZE

1 Acre

CONSTRUCTION COST

$250,000

COMPLETION

2012

SERVICES

Civil Site
Surveying