HIGH ORE MULTIMODAL CORRIDOR
PROJECT DESCRIPTION
The High Ore Line Multimodal Corridor project consists of the creation of a multi-use (walking and biking) greenway trail along abandoned railroad easements. The project spans a distance of 2 ½ miles and connects the cities of Midfield and Birmingham. The scope of work included selective site demolition; clearing and grubbing; grading; erosion control; paving; signage; ADA-accessible sidewalks; and landscaping. This project was funded under the Transportation Investments Generating Economic Recovery (TIGER) Grants awarded by the U.S. Department of Transportation. Design efforts were coordinated and approved by Federal Highway Administration (FHWA).
Engineering services included surveying, trail design, grading and drainage, erosion and sediment control plans, and civil construction details.
OWNER
The City of Birmingham
PROJECT SIZE
2.5 Miles
CONSTRUCTION COST
$2,100,000
COMPLETION
2016
SERVICES
Transportation | Traffic
Surveying