PARKING LOT 15N
PROJECT DESCRIPTION
Engineering and construction administration services for a 150 space parking lot at the University of Alabama at Birmingham. The proposed development consisted of the demolition of existing parking lot and site improvements and the construction of new parking spaces.
At DCS, we place a strong emphasis on well-designed low impact developments and cost effective solutions, which consider environmental concerns. The project incorporated the design of a gravel filtration swale bio-swale to enhance infiltration and reduce surface runoff. The gravel swale serves to reduce sediment load and other water pollutants from reaching natural watercourses.
Engineering services include civil site design, site grading and drainage plan, storm water quality design, erosion and sediment control plans, utility systems design, civil construction details and construction administration.
OWNER
The University of Alabama at Birmingham
PROJECT SIZE
1.4 Acres
CONSTRUCTION COST
$620,000
COMPLETION
2020
SERVICES
Civil Site
Surveying